EIAR Volume 3 (Figures) Environmental Impact Assessment Report (EIAR) Volume 3 – Figures 1. Introduction F1-1 Shannon Technology and Energy Park Masterplan 2. Project Description F2-1 Proposed Development Site Location F2-2 Proposed Development Site Layout F2-3 Power Generation Process F2-4 Landscape Masterplan F2-5 Proposed Development F2-6 Drainage and Outfall F2-7 Lighting Design F2-8 Construction Manpower & Vehicle Traffic Profile Projections 3. Need & Alternatives N/A 4. Planning & Development N/A 5. Land & Soils N/A 6. Water N/A 7. Biodiversity F7-1 Nature 2000 Sites F7-2 Natural Heritage Sites F7-3 Ballylongford Bay pNHA F7-4 Proposed Development relative to the Lower Shannon cSAC and SPA F7-5 Proposed Jetty Relative to the Lower River Shannon cSAC and SPA F7-6 Proposed Jetty Relative to the River Shannon and River Fergus SPA F7-7 SACs within 15 km of Proposed Development F7-8 SPAs within 15 km of Proposed Development F7-9 Proposed Jetty, Outfall and FRSU Relative to the Lower River Shannon cSAC F7-10 Proposed Jetty, Outfall and FRSU Relative to the River Shannon and River Fergus Estuaries SPA F7-11 Proposed Jetty, Outfall and FRSU Relative to the Annex I Habitat 1130 Estuaries of the Lower River Shannon cSAC 8. Air Quality F8-1 Long Term NO2 Process Contribution F8-2 Short Term NO2 Process Contribution F8-3 Long Term NOx Process Contribution F8-4 Long Term Deposition Process Contribution F8-5 Dust Deposit Monitoring Locations 9. Noise & Vibration F9-1 Receptors & Measurement Locations F9-2 Construction Peak 1 F9-3 Construction Peak Roadworks F9-4 Construction Peak 1 Night Time Works F9-5 Construction Peak 2 F9-6 Operational Scenario 1 Unmitigated F9-7 Operational Scenario 2 Unmitigated F9-8 Operational Scenario 1 Mitigated F9-9 Operational Scenario 2 Mitigated 10. Landscape F10-1 Landscape Designations F10-2 Landscape & Seascape Designations 11. Traffic & Transport N/A 12. Cultural Heritage F12-1 Heritage Assets within the 2km Study Area F12-2 1st Edition OS Map F12-3 2nd Edition OS Map F12-4 3rd Edition OS Map F12-5 Cultural Heritage Sites identified during the EIS in 2006 F12-6 Areas of Archaeological Potential uncovered during testing in 2008 F12-7 Proposed Heritage Mitigation 13. Population & Human Health N/A 14. Major Accidents & Disasters N/A 15. Climate N/A 16. Waste N/A 17. Material Assets F17-1 Utilities 18. Interactions N/A 19. Summary of Mitigations N/A